EWP test and tag: what gets tagged and what gets inspected
Last reviewed 19 November 2026.
An elevating work platform (EWP: a scissor lift, boom lift or similar) is not tested and tagged as one item. Two separate regimes apply. The parts that plug into a socket outlet (the battery charger and its supply cord, and any extension lead used to charge the lift or to feed the outlet on the platform) go on the test and tag register: every 3 months on a construction site, otherwise at the interval for your work environment. The machine itself is plant and follows the EWP inspection regime: a check by the operator each shift, a routine inspection at least every 3 months, a periodic inspection at least once a year, and a major inspection after 10 years of service. Different people do each, and the records are kept in different places. The split, a worked example and a sheet to print are below.
The decision rule: which list does this part go on?
- It has a plug that goes into a socket outlet, or it is a lead between a socket outlet and the lift: test and tag register. That is the charger's supply cord and any extension lead.
- It is part of the machine (structure, scissor arms or boom, hydraulics, controls, brakes, tilt alarm, emergency lowering, guard rails, batteries, the charger as a component): EWP inspection logbook.
- It is the boom's insulation on an insulated EWP: specialist dielectric testing, which is neither of the above (see "When this page does not apply").
- You cannot tell: ask the person who does the EWP's periodic inspection and the person who does your test and tag, and write down who has taken it.
The charger appears on both lists for a reason. Safe Work Australia's guide lists "Battery charger" among the items to check in periodic and major inspections, as part of the machine. The supply cord that goes into the wall is plug-in electrical equipment, and that is what test and tag covers.
Test and tag: the plug-in parts
Genie's manual shows what these are on a typical battery scissor lift. It lists a "Battery charger (on battery side of machine)" that takes 85 to 264 V AC, says to "Connect the battery charger to a grounded, AC 3-wire electrical outlet only" and to "Inspect daily for damaged cords, cables and wires", and lists an "AC outlet in platform" as standard, labelled "Power to Platform". That platform outlet is fed by a lead plugged into the machine, so the lead goes on the register too.
| Plug-in part | Construction site | Other workplaces |
|---|---|---|
| Charger supply cord (the plug end of the onboard charger) | 3 months | Your environment's interval (see how often to test and tag) |
| Extension lead used for charging | 3 months | Your environment's interval |
| Lead feeding the platform outlet ("power to platform") | 3 months | Your environment's interval |
| Tools plugged into the platform outlet | 3 months | Your environment's interval |
The 3-month figure is AS/NZS 3012 as SafeWork NSW publishes it ("Portable equipment and flexible electrical cords (extension leads): 3 months") and WorkSafe Queensland ("Construction work – other equipment: 3 months"). Off a construction site, regulation 150 of the WHS Regulations requires plug-in equipment to be tested where it is used in a hostile operating environment; whether that covers your lift depends on where it works.
Three site rules from the SafeWork NSW fact sheet that catch EWP leads:
- Every appliance must be supplied from an RCD-protected circuit: fixed at the switchboard, in the socket-outlet, or in a portable socket-outlet assembly.
- "Socket-outlets on equipment that is supplied by means of a plug and socket" must be individually controlled by a double-pole switch. A platform outlet fed by a lead is that kind of outlet.
- Extension leads must be heavy-duty sheathed, not green, at least 1 mm² per conductor, and within the maximum length for their rating, joined or not (for a 10 A lead: 25 m at 1.0 mm², 35 m at 1.5 mm²). Boom lifts tempt people to join leads; check the total.
The RCD built into a platform outlet. Genie's manual lists a "GFCI outlet" (the US name for an RCD-protected outlet) on the platform. We found no regulator page that says which RCD schedule applies to an RCD that is part of an EWP. Our suggestion, not a rule: press its test button before each use, as for a portable RCD, and ask whoever does the periodic inspection to trip-time test it and put the result in the logbook. See RCD test records for what to write down.
EWP inspections: the machine
These come from the WHS Regulations' plant duties as Safe Work Australia explains them. At a minimum an EWP must be inspected "in accordance with the manufacturer's recommendations", or a competent person's if there are none, or "annually" if neither is reasonably practicable.
| Inspection | How often | Who | Record |
|---|---|---|---|
| Pre-operational | Start of each shift | The operator, familiar with that model | Checklist; WorkSafe Qld: keep 1 year |
| Routine | At least every 3 months unless out of service, or as the manufacturer says | A trained competent person | Written report; life of the machine |
| Periodic (annual) | At least annually unless the manufacturer says otherwise; often set by hours used | WorkSafe Qld: an engineering tradesperson independent of the EWP's operation | Written report; life of the machine |
| Major | After 10 years of service, then every 5 years (Safe Work Australia); sooner if the manufacturer says, after damage or modification, or when imported or recommissioned without records | WorkSafe Qld: likely the manufacturer, an engineering tradesperson or a professional engineer | Report of work done, methods used and qualifications |
Two notes on the sources. Safe Work Australia's guide gives the 10 years then every 5; WorkSafe Queensland's page says the major inspection is due at the end of a 10-year design life and should follow AS 2550.10-2006, and Standards Australia's store now lists a 2025 edition of AS 2550.10 that we have not read. A specialist's blog in the top search results describes the cycle differently again, so go by the manufacturer's manual and your inspector where they differ. And WorkSafe Queensland says the annual inspector "must be someone who does not normally operate the EWP" and must have authority to withdraw it from service.
Safe Work Australia lists what each written report should include: the competent person's name, qualifications and signature, date and place, inspection type, manufacturer, model, serial number, hour meter reading, date of manufacture or commissioning, and rated capacity. Records "must be kept for the period that the EWP is used or until you relinquish control of the EWP", and go to the new owner if it is sold.
Worked example: one battery scissor lift on a fit-out
An illustration, not a real business. A shopfitter owns one battery scissor lift first put into service in April 2016, with an onboard charger and a platform outlet. From 2 March 2026 it is on a construction site. Its charger cord and two leads were last tested on 12 January 2026; its last periodic inspection was in May 2025.
| Item | List | Interval | Next due |
|---|---|---|---|
| Charger supply cord | Test and tag | 3 months on site | 12 April 2026 |
| Charging lead, 10 A, 1.5 mm², 20 m | Test and tag | 3 months on site | 12 April 2026 |
| Power-to-platform lead, 10 A, 1.5 mm², 20 m | Test and tag | 3 months on site | 12 April 2026 |
| Pre-operational check | EWP logbook | Each shift | Every working day |
| Routine inspection | EWP logbook | At most 3 months | 3 months after the last routine inspection |
| Periodic inspection | EWP logbook | At most 12 months | May 2026 |
| Major inspection | EWP logbook | After 10 years of service | April 2026: due now |
What the example shows: the April retest of three leads is a routine visit from a tester, while the major inspection due the same month takes the lift out of service and is likely to need the manufacturer or an engineer. Book the major inspection first and do the test and tag when the lift comes back. And the two 20 m leads cannot be joined to reach the far end of the floor: 40 m is over the 35 m limit for 1.5 mm² at 10 A.
Hired EWPs
SafeWork NSW: for hire equipment, "inspection prior to each hire and testing at not greater than monthly intervals. If hire equipment remains on site, then table two applies." The hire company owns the inspection logbook and should hand you a machine with current inspections. On delivery, check the tag on the charger cord and any supplied leads, ask to see the logbook, and do the pre-operational check yourself each shift. Queensland places separate duties on hire companies; see WorkSafe Queensland's hiring electrical equipment page, linked from its testing and tagging page above.
Two lists: sheet to print
| ☐ | Test and tag register (plug-in parts) |
|---|---|
| ☐ | Charger supply cord tagged; date within the interval (3 months on construction). |
| ☐ | Every lead used to charge or feed the platform tagged, heavy-duty, not green, within length limits. |
| ☐ | Lift plugged into an RCD-protected supply; no household power boards. |
| ☐ | Platform outlet RCD test button pressed before use; result of any trip-time test recorded. |
| ☐ | Tools used from the platform tagged. |
| ☐ | EWP inspection logbook (the machine) |
|---|---|
| ☐ | Today's pre-operational check done and signed (controls, limits, alarms, emergency lowering, tyres, leaks, guard rails, gate, decals, batteries charged). |
| ☐ | Last routine inspection less than 3 months ago, written report on file. |
| ☐ | Last periodic inspection less than 12 months ago (or as the manufacturer says), by someone independent of operating it. |
| ☐ | Years in service checked against the major inspection (10 years, then every 5, or the manufacturer's figure). |
| ☐ | Operator's manual in the storage container on the machine. |
Lift: ____________ Serial: ____________ Hours: ______ Checked by: ____________ Date: ________
Keeping the register on a phone
TagVault can hold the plug-in half: add the charger cord and each lead as an item with the lift's name in its location, and it schedules the retests for the environment you choose and shows what is overdue. It does not keep the EWP inspection logbook, the hour meter or the major inspection date, so keep those with the machine. It is optional; the sheet above does both halves on paper.
Questions
Does a scissor lift need to be tested and tagged?
Its charger cord and leads do. The machine gets EWP inspections instead.
How often is an EWP charger tested and tagged?
Every 3 months on a construction site; otherwise at the interval for your work environment.
Who can do the EWP inspections?
A trained worker for daily and routine checks; usually the manufacturer, an engineering tradesperson or an engineer for annual and major inspections (WorkSafe Queensland).
Is the 10-year major inspection the same as test and tag?
No. It is a strip-down of the machine. Test and tag of the leads carries on separately.
What about insulated EWPs used near power lines?
They have their own dielectric testing by a specialist laboratory. That is not test and tag.
When this page does not apply
- Insulated EWPs for work near live conductors. The boom's insulation is tested by specialist laboratories to the manufacturer's and the electricity network operator's requirements. Ask both; this page does not cover it.
- Plant registration, licences and safe operation. Design registration, high risk work licences and how to operate an EWP are separate topics; start with your state regulator's EWP pages.
- Diesel, LPG or truck-mounted EWPs with no mains connection. Nothing plugs into a socket outlet, so there is nothing to test and tag, unless leads or tools are used from the platform.
- The manufacturer says something different. The manual for your model comes first; the regulators say so.
- New Zealand. See test and tag requirements in NZ; the EWP inspection guidance above is Australian.
TagVault keeps records to support your test and tag program. It does not confer competency or licensing, inspect plant, or determine whether you meet any legal obligation. The quotations above are from the regulator pages and the manufacturer's manual linked, read on the review date; the Australian Standards and your EWP's manual are the authority. The shopfitter in the example is illustrative.